Adding a Polygon

To add a polygon to the plan view:
1. Click Plan to
switch to the plan view.
2. Click Add
Polygon.
3. Draw the polygon by
clicking to add points. Press Backspace to remove the last point. Press
Esc to cancel.
4. If you want a closed
polygon, click the first point when finished. Or for an open polygon,
right-click to add the last point.
Tips:
• The
above steps are only used when adding the polygon. Once it has been added, it
can be easily changed. This includes moving points, adding & deleting
points, and so forth. See Editing Points for
more information.
• When
adding a closed polygon, the resulting shape will be filled by default. If you
want a hollow shape, set the Transparency to 100.
• This
and other plan detail can only be added and edited in the plan view. See Adding Plan Detail for more information about
plan detail objects.
See also:
Shape Properties Adding Plan Detail Setting Object Properties Selecting Objects Selecting Points Editing Objects Editing Points Saving and Loading
Shapes
|